| 1. | Time interval analysis for the production planning of assembly line shop 流水线装配车间生产计划中时区处理的研究 |
| 2. | A non - probabilistic reliability model based on interval analysis was presented 提出了基于区间分析的结构非概率可靠性模型。 |
| 3. | Application of interval analysis methods to surrounding rock stability of deep roadway engineering 区间分析方法在深部岩体工程中的应用 |
| 4. | Stability robustness of closed - loop system with uncertain parameters using interval analysis 不确定参数闭环振动控制系统的稳定性与鲁棒性区间分析 |
| 5. | Interval analysis is used to m odel the uncertainty in the static structural analysis and design 本文采用区间分析法来处理结构静力分析和设计中的不确定性问题。 |
| 6. | Network utilization within the interval analysis is displayed to help match slow responses with heavy network load 显示间隔分析中的网络利用率,可以帮助将慢速响应与较重的网络负荷相比较。 |
| 7. | How to keep the width of solution not be changed is the key of static interval analysis on structural uncertain problems 如何保证解区间不被放大或缩小,是结构不确定性问题静力区间分析的关键。 |
| 8. | Time interval analysis shows network errors organized by time periods to identify whether a problem is sporadic or consistent throughout the day 时间间隔分析按照时间段结构显示网络误差,识别问题是零星出现,还是在一天中连续出现。 |
| 9. | In order to solve the flexible decision problem , the methods used in this paper include maximin method , set inclusion method , interactive method and interval analysis method 为解决柔性决策问题,本文采用了maximin方法、集包含方法、交互式方法和区间分析方法。 |
| 10. | When this is not the case , a technique of modified fuzzy stimulation is made used of by integrating fuzzy stimulation and fuzzy interval analysis 对前者提出以模糊区间分析法求解的思路;对后者则借鉴模糊模拟算法,结合模糊区间分析法,提出了一种改进的模糊模拟算法。 |